It's nice to see you!
Welcome to Marshall Boya
Terms & Conditions
Registration complete
Successfully registered, please login
Registration complete
Forgotten your password?
Please enter email address associated to your account
Change Password
Password changed successfully.
Request sent!
For more tailored inspiration, please fill in the 3 questions below.
Thanks!
Delete Account

Exterior Filler
-
Coverage 1m2/kg
-
Drying Time Waiting time between coats min. 12 hours (20°C, 50% RH), complete drying time Min. 36 hours (20°C, 50% RH)
-
Coats 1
-
Prepares, Protects and Strengthens
-
Water Based
-
Strengthens Adhesion and Increases The Strength Of the Topcoat
Product Description
Application Description
Health & Safety
Tips & Advice
-
1. Preparing the SurfacesFor use on conventional plaster, concrete, exposed concrete, fiberboard, gas concrete, brick and old painted surfaces.
How much paint do I need?
More than one wall to paint? Try our advanced paint calculator
Measure the height and length of the surface you want to paint (in metres or centimetres).


Your Measurements:
{{!-- This value will be injected with JavaScript --}}
Amount needed:
{{!-- This value will be injected with JavaScript --}}
This is an estimated based on 2 coats. Actual coverage will depend on the conditions of the surface. If the colour change is strong, more coats may be required.