It's nice to see you!
Otherwise login by email
Welcome to Marshall Boya
Otherwise login by email
Terms & Conditions
Registration complete
Successfully registered, please login
Registration complete
Forgotten your password?
Please enter email address associated to your account
Change Password
Password changed successfully.
Request sent!
For more tailored inspiration, please fill in the 3 questions below.
Thanks!
Delete Account
Plastic Matt
-
Finish Matt
-
Coverage 14 m2/L
-
Drying Time Waiting time between coats is min. 2 hours. Full drying time is min. 24 hours. Drying time may be longer at high relative humidity and low temperature
-
Coats 2
-
Water Based
-
Machine Tintable White
-
High Coverage Area
-
Hides Surface Defects
-
Low Odor
Product Description
Application Description
For maximum coverage in topcoat paint, attention should be paid to thinning rates, waiting times between coats, and the use of appropriate primer.
Health & Safety
Tips & Advice
-
1. Preparing the SurfacesFor interior use. It is recommended to be applied on smooth and even substrates to ensure the appearance properties.
How much paint do I need?
More than one wall to paint? Try our advanced paint calculator
Measure the height and length of the surface you want to paint (in metres or centimetres).
Your Measurements:
{{!-- This value will be injected with JavaScript --}}
Amount needed:
{{!-- This value will be injected with JavaScript --}}
This is an estimated based on 2 coats. Actual coverage will depend on the conditions of the surface. If the colour change is strong, more coats may be required.